Dimension
Methodology & the 120 checkpoints
Every report score is built from public checkpoints — a fixed 120-point, eight-dimension checklist that you can audit before you book.
120
Total checkpoints
checkpoints
8
Dimensions
All 120 items are listed below, grouped by dimension.
Each engagement is scored against the same 120 checkpoints, grouped into eight dimensions. Every checkpoint is verified on site and scored 1–5. A dimension score is the average of all checkpoints in that dimension; the overall risk level is the equal-weight average of the eight dimension scores. Ranges: 4.0–5.0 low risk, 3.0–3.9 medium risk, below 3.0 high risk. The full list below is the standard used in every report.
01Legal entity & registration
12 checkpoints
- 01.01Business license matches the audited site
- 01.02Legal entity name consistent across documents
- 01.03Unified Social Credit Code verifiable online
- 01.04Registration date matches stated years in business
- 01.05Registered address resolves to the physical site
- 01.06Site title or lease document reviewed
- 01.07Beneficial owner identity confirmed
- 01.08Management structure documented
- 01.09No mismatch between license scope and production
- 01.10Export license or customs registration present
- 01.11Trademark usage rights for claimed brands verified
- 01.12Legal representative name matches bank records
02Equipment & capacity
18 checkpoints
- 02.01Claimed headline machines present on the floor
- 02.02Equipment inventory count matches the checklist
- 02.03Machine nameplates readable and dated
- 02.04CNC, pressing and assembly lines operational
- 02.05Equipment age consistent with claimed history
- 02.06Line capacity observed against stated output
- 02.07Bottleneck stations identified and explained
- 02.08Maintenance records available and current
- 02.09Calibration stickers valid on measuring tools
- 02.10Tooling and mold inventory matches product range
- 02.11Automation level matches the stated process
- 02.12Idle versus running equipment ratio noted
- 02.13Energy supply adequate for stated capacity
- 02.14Compressed air and utilities operational
- 02.15Testing and QC stations equipped as claimed
- 02.16Spare parts and consumables stocked on site
- 02.17Equipment relocation risks assessed
- 02.18Capacity assumptions supported by floor evidence
03Quality management system
16 checkpoints
- 03.01QC department exists with defined authority
- 03.02Incoming material inspection records sampled
- 03.03In-process inspection points identified
- 03.04Final inspection records match output volume
- 03.05Quality control standard or spec available
- 03.06Non-conformance reports reviewed
- 03.07Corrective action follow-up documented
- 03.08Calibration of QC instruments verified
- 03.09First article inspection performed for new orders
- 03.10Sample retention shelf maintained
- 03.11ISO or quality system certificate checked
- 03.12QC personnel qualification records reviewed
- 03.13Defect rate data available for discussion
- 03.14Work instructions present at workstations
- 03.15Traceability of QC records to batches
- 03.16Quality policy communicated to staff
04Site & safety
15 checkpoints
- 04.01Building structure and roofing condition noted
- 04.02Fire exits marked and unobstructed
- 04.03Fire extinguishers present and within validity
- 04.04Emergency lighting functional
- 04.05Evacuation plan posted
- 04.06First aid kits available in work areas
- 04.07Chemical storage separated and labeled
- 04.08Flammable materials stored safely
- 04.09Guardrails on mezzanines and stairs
- 04.10Machine guards installed on moving parts
- 04.11Electrical panels labeled and enclosed
- 04.12Housekeeping level across production areas
- 04.13Waste segregation and disposal documented
- 04.14Workers’ compensation insurance present
- 04.15Site safety meeting records reviewed
05Raw material & supply chain
14 checkpoints
- 05.01Key raw materials identified by product line
- 05.02Material certificates collected for key inputs
- 05.03Incoming material storage conditions acceptable
- 05.04Material turnover consistent with output
- 05.05Supplier list maintained and complete
- 05.06Sub-supplier qualification process exists
- 05.07Batch or lot codes assigned to materials
- 05.08Material test reports on file
- 05.09Recycled or secondary material declared
- 05.10Food-contact or safety compliance docs checked
- 05.11Inventory system matches physical stock
- 05.12Material sourcing country disclosed
- 05.13Price sensitivity of key inputs noted
- 05.14Supply continuity risk assessed
06Process control & traceability
17 checkpoints
- 06.01Process flow documented for main products
- 06.02Work orders issued for running production
- 06.03Batch or lot traceability tested end to end
- 06.04Process parameters recorded for key steps
- 06.05Defect handling loop defined
- 06.06Rework and sorting procedures in place
- 06.07Production schedule visible and realistic
- 06.08Changeover and setup times reasonable
- 06.09Operator training records available
- 06.10Key process steps monitored in real time
- 06.11Finished goods marking and labels verified
- 06.12Sample of claims tested at line speed
- 06.13Critical control points identified
- 06.14Process capability for precision specs noted
- 06.15Outsourced processes declared and controlled
- 06.16Record retention period defined
- 06.17Product counterfeit and mix risks mitigated
07Shipment & packaging
13 checkpoints
- 07.01Export packing standard available
- 07.02Carton marking matches buyer requirements
- 07.03Pallet loading and strapping observed
- 07.04Container stuffing area and method inspected
- 07.05Moisture protection in export packing
- 07.06Load count verification process exists
- 07.07Shipping marks include required info
- 07.08Packing list and invoice checks performed
- 07.09Warehouse storage of finished goods adequate
- 07.10Port and freight arrangements typical
- 07.11Export lead time consistent with stated terms
- 07.12Customs documentation readiness checked
- 07.13Damage during loading risk assessed
08Social responsibility & compliance
15 checkpoints
- 08.01Labor contract review for sampled workers
- 08.02Work hours and overtime within limits
- 08.03Youth worker protections observed
- 08.04Wage payment records sampled
- 08.05Monthly attendance records reviewed
- 08.06Social insurance participation documented
- 08.07PPE use observed across work areas
- 08.08Drinking water and rest areas available
- 08.09Dormitory conditions evaluated
- 08.10Canteen and food safety noted
- 08.11Anti-discrimination policy exists
- 08.12Grievance channel available to workers
- 08.13Environmental discharge permits reviewed
- 08.14EHS training records sampled
- 08.15Forced labor indicators checked
Scored at the visit; every checkpoint below is verified on site and recorded with timestamped evidence in the report.